DEMOLITION, SOFT-STRIP, ASBESTOS REMOVAL – LALEHAM GAP SCHOOL

CLIENT - MCCULLOCH HOMES

LOCATION  -  KENT

CLIENT - MCCULLOCH HOMES

    LOCATION  -  KENT

DEMOLITION, SOFT-STRIP, ASBESTOS REMOVAL – LALEHAM GAP SCHOOL

P1000961

Overview

Once the soft strip operations to the ancillary buildings and main school buildings had completed the next phase included stripping off all accessible roof tiles from both buildings. This operation was carried out utilising an all terrain telehandler fitted with a purpose manufactured man cage.

A lifeline was utilised on the roof, staff working on the roof wore a full body safety harness and a 2-meter lanyard was attached at all times to the safety life line.

The tile removal operation was carried out in conjunction with the attendance of the BAT ecologist who was present on site to carry out primary investigations to lower buildings and out buildings.

Tiles were stripped in sequence and brought down using the man cage to ground level where they were removed and loaded onto the transport lorry, roof tiles were recycled where possible.

 

 

Working from the eastern elevation towards the Western aspect of the building, using   2 x 30t demolition excavators. One fitted with a selector grab and the other fitted with a demolition bucket, the top section of the property was pulled inwards using the rotating grab allowing the arisings to fall within the demolition zone.

The side walls were pulled inwards working from the top down ensuring at all times that the structural stability of the building was maintained.

On completion of the main demolition works all slabs and foundations were removed and crushed on site with all arisings are to be recycled into 6F2 grade materials

Utilising a 40t demolition spec excavator fitted with a long arm and rotating grab the remainder of the roof structure was carefully pulled off in a controlled operation and set aside for processing, all processing was carried out utilising a 29t 360 excavator.

 

Quality Service

We pride ourselves on safe, competent and quality workmanship for all of our projects.

Health & Safety

Aspect Four Demolition is committed to going above and beyond the government standard of health and safety.

Completed - On Time

The whole project was completed on time to the agreed contract terms and to the satisfaction of the clients.